Back to category
Outside Mirror 9042938 Alkar
- Free 30 days exchanges
- Any part, any car
- Fast Next day delivery
- Expert span> support
-
Specifications
Fitting Position Right (driver's side) Operating Mode Electric Surface Primed Outer/Inner Mirror Spherical Guarantee 2 years -
Applicability
SUZUKI GRAND VITARA GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 1.6 All-wheel Drive (JB416) - 1586ccm, 106pk, 78kw - M16A GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 1.6 All-wheel Drive (TA74, JB416) - 1586ccm, 99pk, 73kw - M16A GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 1.9 DDiS (JB419WD, JB419XD) - 1870ccm, 129pk, 95kw - F9QB GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 1.9 DDiS All-wheel Drive (JT419, TD44, JB419WD, JB419XD,... - 1870ccm, 129pk, 95kw - F9QB, F9QC GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 2.0 All-wheel Drive (TD54, JB420) - 1995ccm, 140pk, 103kw - J20A GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 2.4 All-wheel Drive (JB424) - 2393ccm, 169pk, 124kw - J24B GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 2.4 All-wheel Drive (JT424, JB424, TDA4) - 2393ccm, 166pk, 122kw - J24B GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 2.7 (JB627) - 2736ccm, 188pk, 138kw - H 27 A GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 2.7 All-wheel Drive (JB627) - 2737ccm, 188pk, 138kw - H 27 A GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 3.2 All-wheel Drive (JB632, TDB4) - 3195ccm, 224pk, 165kw - N32A GRAND VITARA II (JT, TE, TD) | 04.2005-02.2015 3.2 All-wheel Drive (TDB4, JT632, JB632) - 3195ccm, 233pk, 171kw - N32A -
Original part numbers
84701-65J00-ZA5 SUZUKI -
Manufacturer
Alkar is the European leader in manufacturing and distribution of rearview mirrors and car lighting for the iam with more than 16.000 references. The main factor that makes Alkar the leaders in the sector is their quality policy, which aims to get products that match the top standards. To do so:- Own Quality Department, with 5 Technician
- Test Lab, with the latest test devices
- Road Test (Dynamic Test)
- ISO 9001/2008 by TUV NORD, implemented in our Manufacturing Facilities
- ISO 9001/2008 implemented in factory unit of Portugal by LLOYD´S Register EMEA.
-
Delivery time
Expected delivery date:
01-05-2024
-
Questions?
Secure payment