Back to category
wishbone rubber
- Free 30 days exchanges
- Any part, any car
- Fast Next day delivery
- Expert span> support
Fit guarantee, show parts suitable for your vehicle.
or .
-
Specifications
Fitting Position Rear Axle Fitting Position Inner Left and right, both sides Front Outer Guarantee 2 years Similar products of other manufacturers
Manufacturer Manufacturer number Price BLUE PRINT ADBP800538 FEBI BILSTEIN 184524 GSP 535775 Manufacturer Manufacturer number Price LEMFORDER 43007 01 (this product) OPTIMAL F9-0174 SWAG 33 10 9420 -
Applicability
HYUNDAI TUCSON TUCSON (TL, TLE) | 06.2015-12.2020 1.6 GDi - 1591ccm, 132pk, 97kw - G4FD TUCSON (TL, TLE) | 06.2015-12.2020 1.6 T-GDi - 1591ccm, 177pk, 130kw - G4FJ TUCSON (TL, TLE) | 06.2015-12.2020 1.6 T-GDi All-wheel Drive - 1591ccm, 177pk, 130kw - G4FJ TUCSON (TL, TLE) | 06.2015-12.2020 1.7 CRDi - 1685ccm, 116pk, 85kw - D4FD TUCSON (TL, TLE) | 06.2015-12.2020 1.7 CRDi - 1685ccm, 141pk, 104kw - D4FD TUCSON (TL, TLE) | 06.2015-12.2020 2.0 - 1999ccm, 155pk, 114kw - G4NA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 All-wheel Drive - 1999ccm, 155pk, 114kw - G4NA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 CRDi - 1995ccm, 136pk, 100kw - D4HA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 CRDi - 1995ccm, 185pk, 136kw - D4HA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 CRDi All-wheel Drive - 1995ccm, 136pk, 100kw - D4HA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 CRDi All-wheel Drive - 1995ccm, 185pk, 136kw - D4HA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 CVVT - 1999ccm, 150pk, 110kw - G4NA TUCSON (TL, TLE) | 06.2015-12.2020 2.0 CVVT All-wheel Drive - 1999ccm, 150pk, 110kw - G4NA -
Original part numbers
55253-D3000 HYUNDAI 55253-D3000 KIA -
Manufacturer
Lemförder is part of ZF (Zahnradfabrik Friedrichshafen). A large German manufacturer of, among other things, wishbones, tie rods and stabilizer bars. ZF also produced gears in the early 1900s for Zeppelin GmbH, which produced the first airships. In more than 100 years the company has grown into a prestigious multinational with a turnover of around 32 billion euros. -
Delivery time
Expected delivery date:
18-05-2024
Secure payment